The challenge
We find headroom per EAN, set priorities and configure control so charging, electrification and growth become possible without oversized infrastructure.
Our approach
- Headroom analysis per grid connection.
- Capacity limits, priorities and load balancing.
- Scenarios for battery, generation, charging plaza or phasing.
Result
Do more within the same grid connection. Enable charging, electrification and growth without waiting for grid reinforcement.